With the Beach House under construction on Revere Beach Boulevard, and the new construction on the site of the old Shaw’s Market, people are seeing a lot of wood go up and wonder about safety before and after construction. Revere Deputy Fire Chief Paul Cheever deals with these buildings, new and old, every day. As a licensed engineer and a firefighter, he is uniquely positioned to work with builders to make sure fire safety is addressed. …The sites under construction currently in Revere have amped up security with cameras and security guards on site.“As the construction moves along so does the protection. As the building is framed, we want to make sure they have the stairwell in place and the standpipe (which supplies water). We have to make sure they put in a fire department connection.”