Daily News for July 11, 2025

Today’s Takeaway

Canada and US ramp up talks ahead of August 1 tariff deadline

The Tree Frog Forestry News
July 11, 2025
Category: Today's Takeaway

Canada and US ramp up negotiations ahead of Trump’s August 1 tariff deadline. In related news: a trade deal seems unlikely, as Trump threatens higher tariffs, and Carney seeks to avoid conflict. In other Business news: Kruger expands its Memphis tissue facility; Goodfellow reports stable Q2 sales; the US Lumber Coalition calls for an end to expedited duty reviews, Vancouver’s container port expansion goes out for bid; Canada’s job surge cools talk of a rate cut; US remodeler sentiment dips; and Toronto’s Hälsa project showcases mass timber innovation.

In Forestry/Wildfire news: BC First Nations protest timber sales on unceded territory; Manitoba renews its state of wildfire emergency as wildfires rage and air quality deteriorates; Senator Lee applauds US repeal of the Roadless Rule, as fire-focused budget cuts dominate US Forest Service hearings; a look at a Louisiana wildfire two years post-fire; and Estonia looks to employ more controlled burns.

Finally, FPAC names its 2025 Green Dream Interns; and Oregon’s legendary smokejumper base museum.

Kelly McCloskey, Tree Frog News Editor

Read More

Business & Politics

US Lumber Coalition Calls for Elimination of Expedited CVD Reviews

By Zoltan van Heyningen
TargetedNews Service
July 9, 2025
Category: Business & Politics
Region: Canada, United States

WASHINGTON, July 9 — The U.S. Lumber Coalition (USLC) has submitted a public comment letter to the U.S. Department of Commerce urging the elimination of expedited countervailing duty (CVD). …Zoltan van Heyningen, Executive Director of USLC, emphasized the need to “put American workers, manufacturers, and producers first.” The letter cites the detrimental impact expedited CVD reviews have had on the domestic lumber industry, asserting that these reviews serve as a platform for unfairly subsidized imports. [to access the full story, a TargetedNews Service subscription is required]

Read More

Canada aims for new US trade deal by Aug. 1 as Trump threatens 35% tariffs

By Hunter Crowther
CTV NewsB
July 11, 2025
Category: Business & Politics
Region: Canada, United States

Donald Trump announced Thursday the US will charge a 35% tariff on Canadian imports starting Aug. 1. In an open letter to Prime Minister Carney, he wrote “if you decide to raise your Tariffs, we will be added onto the 35% that we charge.” …“These Tariffs may be modified, upward or downward, depending on our relationship with your Country.” Carney posted on social media that Canada would work towards a revised deadline of Aug. 1 in reaching a new trade deal with the US. “Canada has made vital progress to stop the scourge of fentanyl in North America,” Carney wrote. …Trump pointed to what he called “unsustainable” trade deficits, as well as the Canadian dairy sector. On Wednesday, Trump announced a 50% tariff on copper imports. The US was Canada’s largest copper importer in 2023, accounting for 52% of the total export value. That same year, Canada’s exports of copper and copper-based products were valued at $9.3 billion.

Related coverage in:

Read More

Vancouver Fraser Port Authority opens bids for Roberts Bank Terminal 2 build

By Jeremy Hainsworth
Business in Vancouver
July 10, 2025
Category: Business & Politics
Region: Canada, Canada West

The Vancouver Fraser Port Authority is now searching for a construction company to plan and build the Roberts Bank Terminal 2 container port project wharf and landside facilities. The port said the state-of-the-art marine container terminal will unlock over $100 billion in new trade capacity and contributing $3 billion in GDP annually. …Construction is planned to begin in 2028, and the terminal is expected to be in operation by the mid-2030s. …The port authority has signed mutual benefits agreements with 27 First Nations. …Following the federal and provincial governments’ 2023 approval of the project, the port authority submitted a Species at Risk Act-compliant Fisheries Act authorization application in 2024. A decision on that, the final major permit, is expected no later than October 2026, the port authority said. …Pang said the terminal will be a catalyst for economic transformation nationally. He said it aims to support Prairie grain exports and BC’s forestry sector.

Read More

Kruger Products’ Memphis site announces new converting line for bathroom tissue and paper towels

Kruger Inc.
July 9, 2025
Category: Business & Politics
Region: United States, US East

MISSISSAUGA, Ontario — Kruger Products announced today that its subsidiary, K.T.G. (USA) Inc. will be investing approximately $35 million in a new converting line for bathroom tissue and paper towels at its site in Memphis, TN. The installation is expected to be completed in Q2/2026 and will create about 20 jobs. “With the latest technology, this new converting line will allow us to expand our capacity and produce a wide range of high-quality tissue products for our customers and our White Cloud® brand”, said Gordon Goss, SVP & GM, U.S. & Mexico Consumer Business. “This new line is also part of our plan to reinvest and refocus our Memphis site on driving efficiency for our growing U.S. business.” [END]

Read More

Finance & Economics

Canada’s economy added 83K jobs in June, muting chance of a BoC rate cut

By John MacFarlane
Yahoo! Finance
July 11, 2025
Category: Finance & Economics
Region: Canada

Canada’s labour market defied expectations in June, adding a net 83,100 jobs while the unemployment rate dropped to 6.9%, according to Statistics Canada data released on Friday. The figures make a Bank of Canada interest rate cut less likely, economists say, and will likely move the focus to upcoming inflation data. Financial industry experts had expected the job market to stay essentially flat last month, forecasting a net loss of 3,000 jobs, according to consensus estimates published by the Bank of Montreal. Expectations were for the unemployment rate to increase 0.1 percentage point to 7.1%. The results show the “resilience” of Canada’s labour market, which will be noted by the Bank of Canada, CIBC economist Katherine Judge writes following the release. “While the unemployment rate is still elevated, the strength in other measures in this report clearly diminishes the odds of a BoC cut” at the July 30 interest rate announcement, she says.

Read More

Goodfellow Reports Its Results for the Second Quarter Ended May 31, 2025

By Goodfellow Inc.
Globe Newswire
July 10, 2025
Category: Finance & Economics
Region: Canada, Canada East

DELSON, Quebec — Goodfellow Inc. announced today its financial results for the second quarter ended May 31, 2025. For the three months ended May 31, 2025, the Company reported net earnings of $2.5 million or $0.29 per share compared to net earnings of $5.3 million or $0.62 per share a year ago. Consolidated sales were $152.9 million compared to $140.3 million last year. For the six months ended May 31, 2025, the Company reported net earnings of $0.2 million or $0.02 per share compared to net earnings of $5.2 million or $0.61 per share a year ago, while consolidated sales were $264.1 million compared to $245.7 million last year. At the midpoint of fiscal 2025, Goodfellow’s performance can be characterized as evolving due to challenging market dynamics and inflationary pressures on operational costs. During the second quarter, the Company saw a notable shift in consumer preference toward Canadian-sourced wood products, driven mainly by growing concerns around evolving U.S. trade policy. This shift contributed to modest domestic demand and price stability across several product categories.

Read More

US Remodeling Market Sentiment Dips in Second Quarter

By Eric Lynch
The NAHB Eye on Housing
July 10, 2025
Category: Finance & Economics
Region: United States

In the second quarter of 2025, the NAHB/Westlake Royal Remodeling Market Index (RMI) posted a reading of 59, down four points compared to the previous quarter. While this reading is still in positive territory, some remodelers, especially in the West, are seeing a slowing of activity in their markets. The second-quarter reading of 59 marks only the second time the RMI has dipped below 60 since the survey was revised in the first quarter of 2020. Higher interest rates and general economic uncertainty have affected consumer confidence and are headwinds for remodeling, but not to the extent that they have been for single-family construction, as is evident in June’s negative reading from the NAHB/Wells Fargo Housing Marketing Index (HMI). As a result, NAHB is still forecasting solid gains for remodeling spending in 2025, followed by more modest, but still positive, growth in 2026. …The Current Conditions Index averaged 66, down five points from the previous quarter.  

Read More

Wood, Paper & Green Building

Prefabricated Timber Structure Advances at Hälsa on Royal York

By Anthony Teles
Urban Toronto
July 9, 2025
Category: Wood, Paper & Green Building
Region: Canada, Canada East

Toronto development is currently defined by concrete-and-steel high-rise construction, but Hälsa at 230 Royal York Road stands out as a rare and sustainable alternative. A 9-storey purpose-built residential rental project rising in Mimico, Hälsa is being built using a prefabricated mass timber system. Designed by LWPAC Architects for Leader Lane Developments in partnership with Windmill Development Group, the mid-rise building is being assembled from robotically manufactured panels that are craned into place onsite. The project targets LEED Platinum certification and Tier 2 of the Toronto Green Standard. Located on the northwest corner at Drummond Street, the development just south of the Mimico GO station is part of Leader Lane’s Mimico Collection, a trio of mass timber infill buildings that seek to address Toronto’s housing crisis through more accessible and sustainable construction. …Once complete, Hälsa will rise 31.79m, delivering 60 new rental homes to South Etobicoke.

Read More

Forestry

Five Canadians awarded national 2025 Green Dream Internship

The Forest Products Association of Canada
July 10, 2025
Category: Forestry
Region: Canada

Five students from across the country are bringing their unique voices to the forests this summer. Now in its twelfth year, Forest Products Association of Canada’s (FPAC) 2025 Green Dream Internship Program offers students an opportunity to explore the sector from the inside out, share their experiences, and receive a $1,000 scholarship to support their studies. Over six weeks, interns will document their time in the field through creative storytelling on social media and short videos capturing everyday moments in forest operations…. “The Green Dream Internship is a window into the next generation of talent in our sector”, said FPAC President and CEO, Derek Nighbor. 2025 Green Dream Interns include: Marina Penner, Mercer International, Peace River, AB; Cynthia Laflamme, Domtar, Dolbeau-Mistassini, QC; Andy Chen, West Fraser, Slave Lake, AB; Elizabeth Phillips, Tolko Industries, Meadow Lake, SK; and Logan Englot, Weyerhaeuser, Hudson Bay, SK

Read More

First Nations protest unauthorized timber sale on unceded territory, ministry responds

By Tyson Whitney
North Island Gazette
July 10, 2025
Category: Forestry
Region: Canada West

The Gwa’sala-‘Nakwaxda’xw First Nations (GNN) held a protest outside of the Ministry of Forests office in Port McNeill on July 7. The Nations noted in a media release the protest was in direct response to Interfor Corporation’s attempt to “sell timber harvesting rights within GNN’s unceded Traditional Territory—without GNN’s consent, participation, or recognition of its rights and interests.” “In 1964, the Gwa’sala and ‘Nakwaxda’xw peoples were forcibly removed from their ancestral homelands along the central coast of British Columbia. Displaced by federal policy and relocated to Port Hardy, our communities endured cultural disruption, disconnection from our lands, and inter-generational trauma that still lingers today. Now, more than 60 years later, we face a renewed form of dispossession, this time through economic exclusion.” …GNN noted they are calling on Interfor and the Province of British Columbia to: Immediately halt all timber tenure transfers that ignore Indigenous governance and ecological realities…

Read More

US Forest Service to cut $391M

By Andrew Rice
The Center Square
July 10, 2025
Category: Forestry
Region: United States

The U.S. Forest Services plans to cut its budget by $391 million for fiscal year 2026, according to a proposed budget request. A large portion of the cuts to the forest services budget are expected to be implemented into the new U.S. Wildland Fire Service within the Department of the Interior. Tom Shultz, chief of the U.S. Forest Service, laid out plans to integrate fire service operations within the department and highlighted its focus on a “back-to-basics approach” at a Senate Energy and Natural Resources hearing on Thursday. “The fiscal year 2026 President’s budget refocuses forest service efforts on active forest management, critical minerals permitting, recreation [and] energy development,” Shultz said. Some senators on the committee criticized the forest service’s plans to consolidate fire operations in the Department of Interior.

Read More

US Senate Dems from Western states blast Trump budget for cutting federal aid

By Jacob Fischler
Lansing City Pulse
July 10, 2025
Category: Forestry
Region: United States

Members of the U.S. Senate Energy and Natural Resources Committee differed along party lines at a Thursday hearing about how the U.S. Forest Service should partner with states and how the federal wildfire response should be organized. Senators of both parties emphasized the importance of working with state forest managers. But while Republicans praised the efforts of Forest Service Chief Tom Schultz … to reach out to state governments, Democrats noted that President Trump’s budget request for fiscal 2026 proposed eliminating a key program for state and tribal partnerships. Democrats on the panel also raised a series of questions about the still-unfinished Forest Service budget request as the next fiscal year approaches in less than three months. Schultz told the senators the budget proposal was not yet final, but confirmed the agency was telling states to prepare for zero dollars in discretionary spending for the State, Private, and Tribal Forestry program in fiscal 2026.

Read More

Chairman Lee Applauds Repeal of Roadless Rule in Forest Budget Hearing

U.S. Senate Committee on Energy and Natural Resources
July 10, 2025
Category: Forestry
Region: United States

Mike Lee

WASHINGTON –Senator Mike Lee (R-UT), Chairman of the Senate Committee on Energy and Natural Resources, convened a hearing today to examine the President’s FY26 budget request for the U.S. Forest Service. A major focus of the hearing was the recent announcement of the repeal of the 2001 Roadless Rule—a long-overdue decision that Senator Lee praised as a victory for forest health, wildfire prevention, and timber harvesting. “The Roadless Rule prohibited road construction and timber harvesting on nearly 59 million acres of national forest land, including 60% of Forest Service land in Utah,” said Chairman Lee. “While its intent may have been to preserve the environment, its actual impact has been an environmental disaster.” Senator Lee pressed Forest Service Chief Schultz on the decades-long effects of the rule, asking whether it helps or hinders wildfire mitigation efforts. He also asked what the repeal would mean for timber harvesting and active land management going forward.

Read More

Trump administration wants to increase logging on federal land to reduce fire risks. Not everyone agrees.

By Seiji Yamashita
CBS News
July 10, 2025
Category: Forestry
Region: United States

OREGON — Jeff Brink takes pride in working on the same land his father did, in the national forests surrounding Oakridge, Oregon. But in the decades since, less and less timber has been harvested, and more and more megafires have threatened his hometown. “There needs to be some active management, because no management has given us this result,” he said. When the Trump administration announced executive actions aimed at increasing timber production on federal lands, Oregonians had mixed responses. Loggers and timber towns celebrated the attention, while environmentalists sounded the alarm over fears of deregulation and environmental harm. Local stakeholders wonder what forest management will look like in practice. …The timber industry and environmentalists still have questions as to the actual implementation of policy and changes in practices by federal agencies. Oregon Wild is one of many environmental groups that believe the new executive actions threaten landmark environmental laws.

Read More

Trump wants to cut research centers like the one in this Pacific Northwest forest

By Lynda Mapes
Seattle Times
July 10, 2025
Category: Forestry
Region: United States, US West

H.J. Andrews Experimental Forest

Budget cuts proposed by the Trump administration could lead to the closure of 26 long-term ecological research, or LTER, facilities across the United States, including the H.J. Andrews Experimental Forest in Oregon. President Donald Trump has pitched these cuts to the National Science Foundation for the next budget year, which starts in October. Congress will debate them this summer. Congress will debate these proposed budget cuts this summer, with a House committee considering impacts on the National Science Foundation on July 7. A lot is at stake. The National Science Foundation funds the LTER network, which includes 2,000 scientists at the 26 sites across the country, dedicated to long-term ecological research across a range of landscapes, from tropical rainforests to arctic tundra, seascapes and everything in between.

Read More

A look at Louisiana’s timber industry 2 years after wildfires

By Colin Vedros
KALB News
July 10, 2025
Category: Forestry
Region: United States, US East

ALEXANDRIA, Louisiana — Wildfires and drought destroyed over 60,000 acres of trees in the summer and fall months of 2023 and costing the state $71 million in timber loss. …The wildfires came from record-breaking high temperatures and little to no measurable rainfall that summer. Now, as Louisiana continues to revive its timber industry, there is a renewed interest in the Virginia pine trees that are across the state. But that is also being facilitated by the potential for tariffs on Canadian and Chinese wood and wood products. “The issue has been of Canada and China flooding our markets with their products,” Dr. Mike Strain, the commissioner of Louisiana’s Department of Agriculture and Forestry said. “So, all of that together, I think we’re going to see a strengthening in the timber industry.” …Strengthening the timber industry also calls for more paper mills. “We really need a mill in the Florida parishes,” he said.

Read More

Estonia considers controlled burning to improve the condition of forests

Baltic News Network
July 11, 2025
Category: Forestry
Region: International

Last year, more than 112 thousand hectares of dry forests were listed in the Estonian Natura 2000 habitats. These are forests with minimal anthropogenic load, and in Estonia they are overgrown dunes, old natural forests and spruce forests with rich ground cover. The Estonian Environmental Service, the University of Tartu and the Estonian University of Life Sciences are jointly developing a plan for the maintenance of dry forests. Taavi Tattar, Head of the Nature Conservation Planning Department of the Environmental Service, pointed out that dry forests are in poor condition both in Estonia and throughout Europe. “They’re either too uniform in age or have impoverished structure. Certain species need forests with diverse structures for their life and activities, coarse woody debris, dead trees, and so on. On a broader scale, diverse forests are also more resistant to disease and better able to adapt to climate change,” Tattar said.

Read More

Forest Fires

Manitoba renews provincewide emergency order as wildfires rage, forcing thousands out

By Steve Lambert
Canadian Press in the Winnipeg Free Press
July 10, 2025
Category: Forest Fires
Region: Canada, Canada West

WINNIPEG – The Manitoba government declared a provincewide state of emergency Thursday for the second time this year, as renewed wildfires forced thousands more out of northern communities. With the latest round of fires and evacuations, the province said more than one million hectares have burned — more than 10 times the average over the last 20 years. “This is the worst year in our 30-year electronic record,” said Kristin Hayward with the Manitoba Wildfire Service. In total, about 12,600 people are out of their homes in Manitoba. The government gave notice that it intends to use Winnipeg’s major convention centre to house evacuees. …Over the past week, the fires, aided by lightning strikes, have surged back. “I’ve shaken the hands of American firefighters in northern Manitoba who are helping us out and I would challenge these ambulance chasers in the U.S. Congress to go and do the same,” Premier Wab Kinew said.

 

Read More

Forest History & Archives

These brave Oregon smokejumpers once parachuted into forest fires – now they’re saving history

By Janet Eastman
The Oregonian
July 10, 2025
Category: Forest History & Archives
Region: US West

Southwest Oregon’s Siskiyou Smokejumper Base is where wildfire fighters once parachuted out of airplanes into blazing forests. The legendary smokejumpers launched experimental operations in the 1940s that continue to serve a role in modern firefighting. Historians consider the Cave Junction base the most authentic World War II-era smokejumper museum in the country. …Still in place are the dispatch radio, Motorola intercom and rotary phone that alerted firefighters to board two 1940s Beechcraft jumper planes, which are still on the runway. The U.S. Forest Service’s first smokejumper bases were built in 1943 in Idaho and Oregon to rapidly drop specially trained firefighters into remote areas. Some of the crew had never flown in a plane until they were taught how to jump out of one. After completing their initial attack and when ground crews arrived, smokejumpers would carry out their gear, which weighed more than 120 pounds, for miles to the pick-up location.

Read More